## In **summary**

Before works could begin, temporary pollution control measures were required to avoid any foreign bodies entering the watercourse whilst the works took place.

This included the installation of a silt curtain to control the dispersion of any mud and dirt. As a precaution, an oil boom was also used downstream of the works to ensure any fuel spillages would be contained.

[Download project PDF](/content/wp-content/uploads/2025/01/bank-restoration-works_pn.pdf)

A CAT scan of the area was conducted prior to the excavation of a 3m trench and the installation of support stakes along the river and bankside. Rock rolls were then laid horizontally and securely tied to each other and the hardwood stakes, ensuring a sufficient hold.

Drainage shelves and trenches were dug into the bank and filled with stone to create a constant gradient that will allow the bank to drain during a flood event and protect the surrounding areas.

Once fully installed, soil was layered over the rock rolls followed by a coir roll matting to provide further stabilisation to the bank and prevent future soil erosion.

A final layer of top soil was used to cover the matting and grass seed was distributed across the bank and surrounding areas.